Seeley Swan Pathfinder -

tel:18662240767

By Henry Netherland
Pathfinder 

Traffic experiences delays for project near Lake Alva

 

November 12, 2020

Nathan Bourne, Pathfinder

The Montana Department of Transportation is installing a sheet pile wall intended to stabilize Highway 83 near Lake Alva. The project is expected to conclude Nov. 25.

LAKE ALVA - Motorists should expect traffic disruptions on Highway 83 along Lake Alva due to a Montana Department of Transportation project. The project is intended to re-establish roadway slope stability as well as evaluate a nearby culvert which may need to be repaired or replaced. 

Between mile markers 24.9 to 25 on Highway 83, work began the week of Oct. 12 with traffic diverted into a single lane. Travelers should expect 15 minute delays, 12 foot width restrictions and reduced speeds to 35 miles per hour for the duration of the work which is expected to end Nov. 25.

Slope instability...



For access to this article please sign in or subscribe.



 

Reader Comments
(0)

 
 
omaha-steaks-holiday-banners

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2020